61. 061 Utilities tunnel within communicore. Looking west. Thursday, August 24, 1972 061 Utilities tunnel within communicore. Looking west. Thursday, August 24, 1972 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 247 (digital format only)

62. 062 Witnessing the erection of first steel in communicore area Wednesday, August 9, 1972 062 Witnessing the erection of first steel in communicore area Wednesday, August 9, 1972 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 248 (digital format only)

63. 063 First steel erected at utilities annex, Monday, December 18, 1972. Communicore steel shown in background 063 First steel erected at utilities annex, Monday, December 18, 1972. Communicore steel shown in background Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 249 (digital format only)

64. 064 Winter protection second floor communicore section, looking east. Tuesday, December 19, 1972 064 Winter protection second floor communicore section, looking east. Tuesday, December 19, 1972 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 250 (digital format only)

65. 065 Concrete pour for roof of utilities service tunnel crossing Prince Philip Drive, Tuesday, December 065 Concrete pour for roof of utilities service tunnel crossing Prince Philip Drive, Tuesday, December 19, 1972 Health Sciences Centre - construction - Prince Philip Drive b&w ; 7 x 7 cm ; negative 251 (digital format only)

66. 066 On-site office. To be occupied January 2, 1973 066 On-site office. To be occupied January 2, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 252 (digital format only)

67. 067 First concrete pour second floor communicore area, Tuesday, January 9, 1973 067 First concrete pour second floor communicore area, Tuesday, January 9, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 253 (digital format only)

68. 068 First laying of concrete block in communicore area, Tuesday, January 9th., 1973 068 First laying of concrete block in communicore area, Tuesday, January 9th., 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 254 (digital format only)

69. 069 Structural steel looking north. Area out-lined is the area that has to be completed by September, 069 Structural steel looking north. Area out-lined is the area that has to be completed by September, 1973. Photo taken Monday, January 29, 1973.

Legend in the notes field below.
Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 255 (digital format only)

70. 070 Structural steel looking south-east. Area outlined is the area that has to be completed by September, 070 Structural steel looking south-east. Area outlined is the area that has to be completed by September, 1973. Photo taken Tuesday, January 30, 1973.
Details given below in notes field.
Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 256 (digital format only)

71. 071 Structural steel looking north-west. Area outlined is the area that has to be completed by September 071 Structural steel looking north-west. Area outlined is the area that has to be completed by September 1973. Photo taken Tuesday, January 30, 1973. Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 257 (digital format only)

72. 072 Utilities annex showing structural steel virtually completed. Photo taken Monday, January 29, 1973. 072 Utilities annex showing structural steel virtually completed. Photo taken Monday, January 29, 1973. This building, which consists of two floors, will house the boilers, emergency generators, chillers and pumps. Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 258 (digital format only)

73. 073 Two chillers each with a 1600 ton capacity. Wednesday, February 27, 1973. Details in the notes field 073 Two chillers each with a 1600 ton capacity. Wednesday, February 27, 1973. Details in the notes field below. Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 259 (digital format only)

74. 074 Section of Parkin Architects' office, St. John's. Draftsmen shown are working on finalization of 074 Section of Parkin Architects' office, St. John's. Draftsmen shown are working on finalization of construction documents. Tuesday, February 27, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 260 (digital format only)

75. 075 Photo shows technical production area for Newfoundland Architects' Consortium, G. Granek & Associates, 075 Photo shows technical production area for Newfoundland Architects' Consortium, G. Granek & Associates, Jack Chisvin & Associates. Photo taken in St. John's, Tuesday, February 27, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 261 (digital format only)

76. 076 Mechanical & electrical co-ordinating division shown working on interfacing drawings. Photo taken 076 Mechanical & electrical co-ordinating division shown working on interfacing drawings. Photo taken at site office, St. John's, Newfoundland, Monday, February 25, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 262 (digital format only)

77. 077 Utilities tunnel looking west showing utilities annex in background. Wednesday, February 27, 1973 077 Utilities tunnel looking west showing utilities annex in background. Wednesday, February 27, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 263 (digital format only)

78. 078 East west run of utilities tunnel at site of proposed Engineering Building. Excavations in the foreground 078 East west run of utilities tunnel at site of proposed Engineering Building. Excavations in the foreground are for the new Engineering Building, which has ceased operations for the winter months. Wednesday, February 28, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 264 (digital format only)

79. 079 Preparing gravel base to receive skim slab. Utilities tunnel looking south. Chemistry - Physics Building 079 Preparing gravel base to receive skim slab. Utilities tunnel looking south. Chemistry - Physics Building on left Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 265 (digital format only)

80. 080 Technical production area for Newfoundland Architects' Consortium, K-Mart Plaza, Topsail Road, St. 080 Technical production area for Newfoundland Architects' Consortium, K-Mart Plaza, Topsail Road, St. John's, Tuesday, February 27, 1973 Health Sciences Centre - construction b&w ; 7 x 7 cm ; negative 266 (digital format only)